1984 · U.S. Army Corps of Engineers
Libby Dam’s fifth generator entered service
The Corps places Unit 5’s start in December 1984. It was the first new unit to enter service since Units 3 and 4 in 1976.
Read the Libby Dam water control manual, section 3.03